- POLE LINE HARDWARES
- AL P.G CLAMP
- CLAMP, DEADEND, STRAIN, AL
- AL SUSPENSION CLAMP
- ALLEY ARM BRACE
- ANCHOR ASSEMBLY
- ANCHOR EXPANDING 8-WAY
- ANCHOR ROD
- ANCHOR SHACKLE
- ANGLE BRACE DOUBLE SPAN
- ANGLE BRACKET
- ANGLE THIMBLE EYELET
- BALL CLEVIS
- BALL Y CLEVIS
- CARRIAGE BOLT
- CHAIN SHACKLE
- CLAMP LOOP DEADEND
- CROSS ARM CLEVIS
- CROSSARM INSULATOR PIN
- CROSS-PLATE ANCHOR
- DOUBLE ARMING BOLT
- DOUBLE ARMING PLATE
- EYE CLEVIS
- EYELET STRAIGHT
- FLAT CROSSARM BRACES
- FORGE EYE SHAFT SCREW ANCHOR
- FORGED THIMBLE EYE BOLT
- GROUND PLATE POLE BUTT
- GROUND ROD CLAMP
- GROUND RODS
- GUY ATTACHMENT
- GUY BONDING CLAMP
- GUY CLAMP
- GUY CLIP
- GUY HOOK
- GUY STRAIN PLATE
- GUY THIMBLE
- HOT LINE CLAMP
- INSULATOR STEEL PIN
- LAG SCREW
- MACHINE BOLT
- MF LOCK NUT
- MOUNTING BRACKET FOR FUSE CUT OUT & ARRESTER
- MOUNTING CLAMP ADAPTER
- OVAL EYE BOLT
- OVAL EYE NUT
- PLATE CROSSARM REINFORCING
- POLE TOP PIN
- SECONDARY BRACKET
- SECONDARY CLEVIS
- SECONDARY RACK
- SINGLE SPOOL SECONDARY RACK
- SOCKET CLEVIS
- SOCKET EYE
- SPOOL BOLT
- SQUARE NUT
- STAPLE NAIL
- THIMBLE CLEVIS
- THIMBLE EYE NUT
- TRANSFORMER POLE MOUNTING BRACKET
- WAHSERS
- MEDIA LUNA
- FUSE CUT OUT
- POLYMER INSULATOR
- PORCELAIN INSULATORS
- METER INSTALLATION
- ELECTRICAL ACCESSORIES
1 surface preparation
Transport tools and materials to work under the tower, cross arm insulator surfacecleaning, and ensure the power armour clamp bolt is complete.
2 replacing the head hoop
Pole climbing staff before demolition of the old needle bottle after the removal of headhoop in the operation, the top phase conductor line in the old crossarm. With the ground staff, will enhance the power plug into the operation and installation, and thenlifting bar new bottle and installed, the conducting wire binding in the top phase needle bottle. To be firmly, prevent wire movement.
3 installation tackle
To climb up the pole and ground staff, will block up to the job, installed in the electricplug on the head hoop.
4 new cross arm and needle bottle
Pole climbing staff before demolishing the old bottle after the demolition of the oldneedle are supporting iron, hoop and cross arm in operation, wire hanging on the pulley. With the ground staff, the old material transfer to the ground, and thenenhance the cross arm, new supporting iron and hoop and install, and then lifting barnew bottle and install. The delivery process, delivery speed uniform, to prevent damage to people and material, the fastening screws to tighten. Wire for wire lashingbar new bottle, to be firmly, prevent wire movement.
5 remove pulley
To climb up the pole and ground staff, will remove the pulley, transmitted to theground.
6 quality inspection
Solid check on the fastening screw and wire.
7 officers under the bar
Rod without legacy worker check tower on the tools and materials, carrying thetransmission rope tower.